Update: Macksville - Scotts Head Active Transport

The latest update provided by The Scotts Head Community Group on the proposal of an Active Transport connection between Scotts Head and Macksville has outlined the Stage 1 details of development.

This initial stage will include the construction of a suspension bridge over Warrell Creek and the flood prone zone (approx 1.6Km in length).

Alongside the bridge, the proposal outlines upgrades to the Gumma Rd verges and signage between Macksville via Bald Hill.

If you wish to get involved in the proposal to council you can do so via the below link:

https://scottshead.org.au/contact-us/

For an up to date timeline of the proposal, click here.

Previous
Previous

2025 Wheelsmith Tour de France Time Trial

Next
Next

2025 Jacks Ridge Triple X